| 1. | Transferring water or increasing water - the anxiety and reverie about water resources in china 关于我国水资源的忧思与遐想 |
| 2. | Many countries had taken the measure of transferring water permits under this background 在此背景下,许多国家开始实行用水许可证转让。 |
| 3. | They plan to construct a pipeline to transfer water to the dead sea from the nearby red sea 他们计划建造一条管线,将临近的红海海水引入死海。 |
| 4. | Environmental capacity of migrant in nanyang city in danjiangkou reservoir area of middle line project of transferring water from south to north 南水北调中线工程丹江口库区南阳市域移民环境容量研究 |
| 5. | Main engineering geological problems of active faults in the 1st stage project of western line for transfering water from southern to northern china 南水北调西线一期工程区断层活动性及工程地质评价 |
| 6. | This was a twin pipeline , each pipe having a diameter of 30 inches and a length of 8 miles . it was completed in 1963 and transferred water from the silvermine bay treatment works to sandy bay at mount davis 该输水管为双喉管,每条直径30寸,全长8哩,流经周公岛,抵港岛摩星岭大口环。 |
| 7. | The characteristics are analyzed . it is suggested that the compensation measure should include price compensation and other compensation measures . yellow river transferring water to outside - basin market is studied 分析了黄河农业水权转非的类型及特点,提出了农业水权转非的价格补偿和其他补偿措施。 |
| 8. | The study shows that the amounts of transferred water meet the demands along the route and , under a sound regulation process , both the south and north parts of the yellow river achieve a relatively high guaranteed rate of water supply 本次研究结果表明南水北调东线工程调水量满足调水沿线的需水要求,黄河以南、黄河以北均有较高的保证率,调度过程合理。 |
| 9. | In early 1934 , the government planned to construct the second cross - harbour pipeline . the diameter of the new pipeline was 18 inches . it transferred water from the shing mun reservoir to queen s pier on the island 政府于1934年初计划兴建第二条的海底输水管,直接将城门水塘的淡水引入港岛皇后码头,输水管直径18寸,全长约5 , 914尺,由57段长100尺的水管连接。 |
| 10. | On the base of the river ice study , the former ussr , canada , north europe take some effective measures to transfer water safely on their water transfer projects , and these countries have accumulated a few valuable experience 前苏联,加拿大,北欧等国家和地区结合河冰研究的成果,在引水工程中采取各种有效措施,达到了冬季安全引水的目的,积累了许多有价值的经验。 |